S T E E L ENTRY D O O R S installation cost below
-
Front Door basic entry door install includes:Installation of one Pre-hung front door and slab. Steel foam filled Solid core. 1 3/4" thick.1 basic door
Basic Single Steel Front Door Installation Labor:
Basic labor to install new prehung front door with favorable site conditions. Initial free Measure. Install Includes planning, equipment and install material acquisition, area preparation and protection, setup and cleanup. Basic prep to existing opening. Professionally install pre-hung door. Reinstall existing trims New door to fit existing framing opening jamb with no repairs or modifications. Handle and Lock set mortise, place hinge locations. Install hinges. May included fabricate holes, mortises for door handle set and jamb strike plate. Install /adjust sill sweep / adjustments to seal at door bottom. Caulk out all fasteners, and joints in best match caulking. Clean-up
-
Single Side Light door. Font Door basic entry door install includes: Installation of one Prehung front door and slab. Steel foam filled Solid core. 1 3/4" thick.1 basic door “with no transom”
Basic Sidelight door with one side light_ Steel Front Door Installation Labor: Door is not included
Basic labor to install new prehung front door with favorable site conditions. Initial free Measure. Install Includes planning, equipment and install material acquisition, area preparation and protection, setup and cleanup. Basic prep to existing opening. Professionally install pre-hung door. Reinstall existing trims New door to fit existing framing opening jamb with no repairs or modifications. Handle and Lock set mortise, place hinge locations. Install hinges. May included fabricate holes, mortises for door handle set and jamb strike plate. Install /adjust sill sweep / adjustments to seal at door bottom. Caulk out all fasteners, and joints in best match caulking. Clean-up iption text goes here
-
Double sidelight steel entry door system, install only. Starts at $840.00
Two side light door. Font Door basic entry door install includes: Installation of one Prehung front door and slab. Steel foam filled Solid core. 1 3/4" thick.1 basic door “with no transom”
Basic Sidelight door with one side light_ Steel Front Door Installation Labor: Door is not included
Basic labor to install new prehung front door with favorable site conditions. Initial free Measure. Install Includes planning, equipment and install material acquisition, area preparation and protection, setup and cleanup. Basic prep to existing opening. Professionally install pre-hung door. Reinstall existing trims New door to fit existing framing opening jamb with no repairs or modifications. Handle and Lock set mortise, place hinge locations. Install hinges. May included fabricate holes, mortises for door handle set and jamb strike plate. Install /adjust sill sweep / adjustments to seal at door bottom. Caulk out all fasteners, and joints in best match caulking. Clean-up
Feature 1
STEEL DOORS - THE MOST AFFORDABLE DOOR:
Steel doors have a huge range of quality and price. Steel is a popular choice today because it is more affordable than other materials yet still offers stylish design options,
Feature 2
Security, and low maintenance:
The most important factor to consider when buying a steel door is the gauge. The higher the number, the thinner the steel.248-gauge steel doors are commonly found but they are A good inexpensive solution. 24-gauge steel doors are a better option because it’s thicker steel that won’t bend or flex as easy. But the best steel doors are made by PROVIA. Provia has a 20-gauge, Legacy steel door it holds against extreme use and security extremely well.
Front Door Installation Job Supplies
Cost of related materials and supplies typically required to install front door including: fasteners, shims, flashing, drip cap, perimeter foam insulation and exterior caulking.
Installation power equipment is provided by WADMS:
Job related costs of Consumables ,specialty equipment used for job quality and efficiency, including: Pneumatic finish nailer, miter saw, circular saw, Elec hand planer.all fastners. Drills routers, hand tools truck and equipment. Daily equipment rental for high locations. extra.
Added helper Minimum Labor charge included in basic charges.
Larger projects requiring the “whole crew” will increase the cost of your project.
_Items Sold separately as line items_
new interior trims, Under-sill rework, soffit and fascia over head work, storm door install. locks and handles, customer rework to new door or existing openings, Infield jamb extension kits, resizing of exterior brick moldings, removing siding or re-siding repairs, and haul-a-way of old debris and doors.
( many door installations do not require these items. )